Summary: Panama Canal Authority announces increase in daily navigation slots at the Panamax lock to adjust to predicted water levels in Gatun Lake.
On the 11th, the Panama Canal Authority announced plans to increase the daily transit slot capacity at the Panama locks to accommodate the anticipated water levels in Gatun Lake. Starting from the 18th to the 25th, there will be a gradual increase in transit slots, with the current 24 slots expected to rise to 27 slots per day. This adjustment aims to efficiently manage the canal’s operations in response to changing water levels and ensure smooth maritime traffic flow through the Panama Canal. Stay updated on the implementation of the increased transit slot capacity at the Panama locks and its impact on the canal’s operations and shipping efficiency.